CS605 Final Term Solved Paper 2010

FINAL TERM  EXAMINATION
Spring 2010
CS605- Software EngineeringII (Session - 4)

Time: 90 min
M a r k s: 60
Question No: 1    ( M a r k s: 1 )    http://vuzs.net
 In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the
 
 
       ► design is maintainable
       ► design is not maintainable
 
 
       ► design has  completed
 
 
       ► none of the given
 
 
   
Question No: 2    ( M a r k s: 1 )    http://vuzs.net
 We can include following type of data in the database for creating matrix aganst each project except
 
 
       ► name of project
 
 
       ► size of project
 
 
       ► company’s CEO name
 
 
       ► cost of project
 
 
   
Question No: 3    ( M a r k s: 1 )    http://vuzs.net
 The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator.
 
 
       ► true
       ► false
   
Question No: 4    ( M a r k s: 1 )    http://vuzs.net
 A consideration of software scope must include an evaluation of all external interfaces.
 
 
       ► true
       ► false
   
Question No: 5    ( M a r k s: 1 )    http://vuzs.net
 If an error related to requirements is identified in testing phase, so this error will be considered as an error in  ___________ phase.
 
 
       ► Design
 
 
       ► Code
 
 
       ► Requirement

Question No: 6    ( M a r k s: 1 )    http://vuzs.net
 Usually the performance of the organization change over-night.
 
 
       ► True
 
 
       ► False
 
 
   
Question No: 7    ( M a r k s: 1 )    http://vuzs.net
 Quality is the compliance of software to implicit and explicit quality factors. Identify the explicit requirement from the following:
 
 
       ► Maintainability
 
 
       ► Compliance with CMMI
 
 
       ► Ease of use
 
 
       ► Efficiency
 
 
   
Question No: 8    ( M a r k s: 1 )    http://vuzs.net
 Following are the benefits of conducting review except

       ► Help in finding the size of the project
 
 
       ► Helps in verifying the quality of product
 
 
       ► Help in identifying where improvement is required.
       ► Helps in identifying the bugs in the work product
 
 
   
Question No: 9    ( M a r k s: 1 )    http://vuzs.net
 Mean Time To Repair (MTTR) is the
 
 
       ► Time when system remained unable for usage
 
 
       ► Time taken to fix the error
 
 
       ► Time taken to repair the software
 
 
       ► All of the given options are correct.

Question No: 10    ( M a r k s: 1 )    http://vuzs.net
 Reliability and Safety are same concepts with respect to software quality
 
 
       ► True
       ► False
   
Question No: 11    ( M a r k s: 1 )    http://vuzs.net
 SCM is the requirement of the ________ level(s) of CMM
 
 
       ► First
 
 
       ► Second and later
 
 
       ► Third and later
 
 
       ► Only Second
 
 
   
Question No: 12    ( M a r k s: 1 )    http://vuzs.net
 We can include following items during configuration item identification:
 
 
       ► User Manuals and Documentations
 
 
       ► Source Code
 
 
       ► Software Requirement Specifications
 
 
       ► All of the given choices are correct
 
 
   
Question No: 13    ( M a r k s: 1 )    http://vuzs.net
 If a new version of a product is released by fixing the bugs in the previous release then it is termed as _________________
       ► Product Update
 
 
       ► Product Upgrade
 
 
       ► Defect Removal

       ► Product Performance
   
Question No: 14    ( M a r k s: 1 )    http://vuzs.net
 Every node signifies ___________ version of a release
 
 
       ► one
 
 
       ► two
 
 
       ► three
 
 
       ► four

Question No: 15    ( M a r k s: 1 )    http://vuzs.net
 The Change Control Authority does not have the rights to permit to bring the change in the software
       ► True
 
 
       ► False
 
 
   
Question No: 16    ( M a r k s: 1 )    http://vuzs.net
 Check in and Check out is actually one and the same process with two different names

       ► True
       ► False
   
Question No: 17    ( M a r k s: 1 )    http://vuzs.net
 There could be multiple GUIs to satisfy one requirement
       ► True
       ► False

Question No: 18    ( M a r k s: 1 )    http://vuzs.net
 _____________ is the process of Design recovery. At this stage the documentation of the overall functionality is created.
 
       ► Database Engineering
       ► Reverse Engineering
       ► Refactoring
       ► Forward Engineering
   
Question No: 19    ( M a r k s: 1 )    http://vuzs.net
 In code restructuring, we do not change the functionality of the code
 
       ► True
 
 
       ► False

   
Question No: 20    ( M a r k s: 1 )    http://vuzs.net
 In ______________, new user and technology requirement can also be integrated into the re-engineering effort.
 

       ► Backward re-engineering
 
 
       ► Forward re-engineering
 
 
       ► Business Engineering
 
 
       ► Business Process Engineering
 
 
   
Question No: 21    ( M a r k s: 1 )    http://vuzs.net
 A _____________process is “a set of logically related tasks performed to achieve a defined business outcome”.
 
 
       ► Business
 
 
       ► Software
 
 
       ► CMM
 
 
       ► ISO
 
 
   
Question No: 22    ( M a r k s: 1 )    http://vuzs.net
 Software refactoring is a process in which
 
       ► External behavior of the system does not change
 
 
       ► Internal behavior of the system does not change
 
 
       ► Design of the software changes
 
 
       ► Architecture of the software changes
 
 
   
Question No: 23    ( M a r k s: 1 )    http://vuzs.net
 The formal methods model of software development makes use of mathematical methods to
 
 
 
       ► define the specification for computer-based systems
       ► all of the given
 
 
       ► develop defect free computer-based systems
 
 
       ► verify the correctness of computer-based systems

Question No: 24    ( M a r k s: 1 )    http://vuzs.net
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?

       ► Product Quality
 
 
       ► Software scope estimation
 
 
       ► Resources requirements
 
 
       ► Time requirements
 
 
   
Question No: 25    ( M a r k s: 1 )    http://vuzs.net
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?

       ► Resources requirements
       ► Software scope estimation
       ► Time requirements
       ► Product Quality 
 
Question No: 26    ( M a r k s: 1 )    http://vuzs.net
 The software plan is not a static document, it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets.
       ► True
       ► False

Question No: 27    ( M a r k s: 1 )    http://vuzs.net
 The projects are classified into following categories except
 
 
       ► New application development
       ► Reengineering projects
       ► Concept development projects
       ► Marketing Development Projects

 
Question No: 28    ( M a r k s: 1 )    http://vuzs.net
 The processes at ----------- is focus on continually improving process performance through both incremental and innovative technological changes/improvements.

       ► Level 5
       ► Level 1
       ► Level 4
       ► Level 3
   
Question No: 29    ( M a r k s: 1 )    http://vuzs.net
 Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives at -------------.

       ► Level 3
       ► Level 2
       ► Level 5
       ► Level 1
   
Question No: 30    ( M a r k s: 1 )    http://vuzs.net
 Reliability of a software is a
 
 
       ► functional requirement
       ► non-functional requirement
       ► Design Requirement
       ► None of the given
 
Question No: 31    ( M a r k s: 2 )
 What issues must be included in the review list?

Question No: 32    ( M a r k s: 2 )
 What is meant by requirement management?
 
Requirement Management is defined as a systematic approach to eliciting, organizing, and documenting the requirements of the system, and a process that establishes and maintains agreement between the customer and the project team on the changing requirements of the system.
   
Question No: 33    ( M a r k s: 2 )
 Give any two advantages of Software CMM?
   
Question No: 34    ( M a r k s: 2 )
 How can we implemente metrics in small organizations ?
  
Question No: 35    ( M a r k s: 3 )
 Give in brief any three factors related with operation?
 
 
   
Question No: 36    ( M a r k s: 3 )
 Discuss the hazards those are associated with a computer-based cruise control for an automobile?
 
 
   
Question No: 37    ( M a r k s: 3 )
 What would you understand by the conventional numbering of the product release?
 
Question No: 38    ( M a r k s: 3 )
 Write down the levels of Capability Maturity Model (starting from 0-5)?
   
Question No: 39    ( M a r k s: 5 )
 What are the risks associated in the migration of a Legacy system to a new system?

   
Question No: 40    ( M a r k s: 5 )
 How Duplicate Code can cause problem in the maintenance of a program? Explain briefly.

Leave a Reply

Related Posts Plugin for WordPress, Blogger...