CS605 Final Term Solved Paper 2010

FINAL TERM  EXAMINATION
Spring 2010
CS605- Software EngineeringII (Session - 4)

Time: 90 min
M a r k s: 60
Question No: 1    ( M a r k s: 1 )    http://vuzs.net
 In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the
 
 
       design is maintainable
       design is not maintainable
 
 
       design has  completed
 
 
       none of the given
 
 
   
Question No: 2    ( M a r k s: 1 )    http://vuzs.net
 We can include following type of data in the database for creating matrix aganst each project except
 
 
       name of project
 
 
       size of project
 
 
       company’s CEO name
 
 
       cost of project
 
 
   
Question No: 3    ( M a r k s: 1 )    http://vuzs.net
 The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator.
 
 
       true
       false
   
Question No: 4    ( M a r k s: 1 )    http://vuzs.net
 A consideration of software scope must include an evaluation of all external interfaces.
 
 
       true
       false
   
Question No: 5    ( M a r k s: 1 )    http://vuzs.net
 If an error related to requirements is identified in testing phase, so this error will be considered as an error in  ___________ phase.
 
 
       Design
 
 
       Code
 
 
       Requirement

Question No: 6    ( M a r k s: 1 )    http://vuzs.net
 Usually the performance of the organization change over-night.
 
 
       True
 
 
       False
 
 
   
Question No: 7    ( M a r k s: 1 )    http://vuzs.net
 Quality is the compliance of software to implicit and explicit quality factors. Identify the explicit requirement from the following:
 
 
       Maintainability
 
 
       Compliance with CMMI
 
 
       Ease of use
 
 
       Efficiency
 
 
   
Question No: 8    ( M a r k s: 1 )    http://vuzs.net
 Following are the benefits of conducting review except

       Help in finding the size of the project
 
 
       Helps in verifying the quality of product
 
 
       Help in identifying where improvement is required.
       Helps in identifying the bugs in the work product
 
 
   
Question No: 9    ( M a r k s: 1 )    http://vuzs.net
 Mean Time To Repair (MTTR) is the
 
 
       Time when system remained unable for usage
 
 
       Time taken to fix the error
 
 
       Time taken to repair the software
 
 
       All of the given options are correct.

Question No: 10    ( M a r k s: 1 )    http://vuzs.net
 Reliability and Safety are same concepts with respect to software quality
 
 
       True
       False
   
Question No: 11    ( M a r k s: 1 )    http://vuzs.net
 SCM is the requirement of the ________ level(s) of CMM
 
 
       First
 
 
       Second and later
 
 
       Third and later
 
 
       Only Second
 
 
   
Question No: 12    ( M a r k s: 1 )    http://vuzs.net
 We can include following items during configuration item identification:
 
 
       User Manuals and Documentations
 
 
       Source Code
 
 
       Software Requirement Specifications
 
 
       All of the given choices are correct
 
 
   
Question No: 13    ( M a r k s: 1 )    http://vuzs.net
 If a new version of a product is released by fixing the bugs in the previous release then it is termed as _________________
       Product Update
 
 
       Product Upgrade
 
 
       Defect Removal

       Product Performance
   
Question No: 14    ( M a r k s: 1 )    http://vuzs.net
 Every node signifies ___________ version of a release
 
 
        one
 
 
       two
 
 
       three
 
 
       four

Question No: 15    ( M a r k s: 1 )    http://vuzs.net
 The Change Control Authority does not have the rights to permit to bring the change in the software
       True
 
 
       False
 
 
   
Question No: 16    ( M a r k s: 1 )    http://vuzs.net
 Check in and Check out is actually one and the same process with two different names

       True
       False
   
Question No: 17    ( M a r k s: 1 )    http://vuzs.net
 There could be multiple GUIs to satisfy one requirement
       True
       False

Question No: 18    ( M a r k s: 1 )    http://vuzs.net
 _____________ is the process of Design recovery. At this stage the documentation of the overall functionality is created.
 
       Database Engineering
       Reverse Engineering
       Refactoring
       Forward Engineering
   
Question No: 19    ( M a r k s: 1 )    http://vuzs.net
 In code restructuring, we do not change the functionality of the code
 
       True
 
 
       False

   
Question No: 20    ( M a r k s: 1 )    http://vuzs.net
 In ______________, new user and technology requirement can also be integrated into the re-engineering effort.
 

       Backward re-engineering
 
 
       Forward re-engineering
 
 
       Business Engineering
 
 
       Business Process Engineering
 
 
   
Question No: 21    ( M a r k s: 1 )    http://vuzs.net
 A _____________process is “a set of logically related tasks performed to achieve a defined business outcome”.
 
 
       Business
 
 
       Software
 
 
       CMM
 
 
       ISO
 
 
   
Question No: 22    ( M a r k s: 1 )    http://vuzs.net
 Software refactoring is a process in which
 
       External behavior of the system does not change
 
 
       Internal behavior of the system does not change
 
 
       Design of the software changes
 
 
       Architecture of the software changes
 
 
   
Question No: 23    ( M a r k s: 1 )    http://vuzs.net
 The formal methods model of software development makes use of mathematical methods to
 
 
 
       define the specification for computer-based systems
       all of the given
 
 
       develop defect free computer-based systems
 
 
       verify the correctness of computer-based systems

Question No: 24    ( M a r k s: 1 )    http://vuzs.net
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?

       Product Quality
 
 
       Software scope estimation
 
 
       Resources requirements
 
 
       Time requirements
 
 
   
Question No: 25    ( M a r k s: 1 )    http://vuzs.net
 Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?

       Resources requirements
       Software scope estimation
       Time requirements
       Product Quality 
 
Question No: 26    ( M a r k s: 1 )    http://vuzs.net
 The software plan is not a static document, it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets.
       True
       False

Question No: 27    ( M a r k s: 1 )    http://vuzs.net
 The projects are classified into following categories except
 
 
       New application development
       Reengineering projects
       Concept development projects
       Marketing Development Projects

 
Question No: 28    ( M a r k s: 1 )    http://vuzs.net
 The processes at ----------- is focus on continually improving process performance through both incremental and innovative technological changes/improvements.

       Level 5
       Level 1
       Level 4
       Level 3
   
Question No: 29    ( M a r k s: 1 )    http://vuzs.net
 Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives at -------------.

       Level 3
       Level 2
       Level 5
       Level 1
   
Question No: 30    ( M a r k s: 1 )    http://vuzs.net
 Reliability of a software is a
 
 
       functional requirement
       non-functional requirement
       Design Requirement
       None of the given
 
Question No: 31    ( M a r k s: 2 )
 What issues must be included in the review list?

Question No: 32    ( M a r k s: 2 )
 What is meant by requirement management?
 
Requirement Management is defined as a systematic approach to eliciting, organizing, and documenting the requirements of the system, and a process that establishes and maintains agreement between the customer and the project team on the changing requirements of the system.
   
Question No: 33    ( M a r k s: 2 )
 Give any two advantages of Software CMM?
   
Question No: 34    ( M a r k s: 2 )
 How can we implemente metrics in small organizations ?
  
Question No: 35    ( M a r k s: 3 )
 Give in brief any three factors related with operation?
 
 
   
Question No: 36    ( M a r k s: 3 )
 Discuss the hazards those are associated with a computer-based cruise control for an automobile?
 
 
   
Question No: 37    ( M a r k s: 3 )
 What would you understand by the conventional numbering of the product release?
 
Question No: 38    ( M a r k s: 3 )
 Write down the levels of Capability Maturity Model (starting from 0-5)?
   
Question No: 39    ( M a r k s: 5 )
 What are the risks associated in the migration of a Legacy system to a new system?

   
Question No: 40    ( M a r k s: 5 )
 How Duplicate Code can cause problem in the maintenance of a program? Explain briefly.